ZIMBABWE ELECTRICITY TRANSMISSION & DISTRIBUTION COMPANY
OUTHERN REGION
Daily Fault Report Date: 09 APRIL 2018
No. |
Client Centre |
Feeder |
Nature of Fault |
Date of Fault |
Number of Affected Customers |
Expected Date of Restoration |
Responsibility |
1.0 | GWERU ENVIRONS | 11kV Chiwundura Feeder | Line Fault |
08/04/2018 |
500 |
09/04/2018 |
District Manager
(Gweru) |
2.0 |
NEMBUDZIYA |
33kV Tshoda Feeder |
Line Fault |
28/03/2018 |
200 |
10/04/2018 |
District Manager
(Kwekwe) |
3.0 |
GOKWE |
33kV Manoti Feeder |
Line Fault |
02/04/2018 |
40 |
09/04/2018 |
District Manager
(Kwekwe) |
4.0 |
REDCLIFF |
11kV Zhombe Feeder |
Line Fault |
08/04/2018 |
100 |
09/04/2018 |
District Manager
(Kwekwe |
5.0 |
ZVISHAVANE | 11kV Mnene Feeder | Line Fault |
08/04/2018 |
500 |
09/04/2018 |
Principal Engineer (Zvishavane) |
6.0 |
ZVISHAVANE | 11kV Rural Feeder | Poles Down |
08/04/2018 |
100 |
11/04/2018 |
Principal Engineer (Zvishavane) |
Comments:
1.0 The Chiwundura Feeder faulted on 08/04/2018 and the fault was still being located. The expected power restoration date is 09/04/2018. 2.0 The Tshoda Feeder faulted on 28/03/2018 and the fault was being located. The expected power restoration date is 10/04/2018 3.0 The Manoti Feeder faulted on 02/042018 and the fault was being located. The expected power restoration date is 09/04/2018 4.0 The Zhombe Feeder faulted on 08/04/2018 and the fault was being located. The expected power restoration date is 09/04/2018 5.0 The Mnene Feeder faulted on 08/04/2018 and the fault was being located. The expected power restoration date is 09/04/2018 6.0 The Zvishavane Rural Line fault was located as 9 poles down. The feeder faulted on 08/04/2018 and the expected power restoration date is 11/04/2018.
Increase In Faults due to the Rains |
Eng. G. Kasipo
Engineering Manager – Southern