RFQ Number | Items Required | Qty | Date Posted | Closing Date | Closing time |
PR10252724 |
Stay Bow | 75 | 08/08/2023 | 09/08/2023 | 10:00 PM |
Stay Plate Galv | 75 | 08/08/2023 | 09/08/2023 | 10:00 PM | |
Stay Washer | 75 | 08/08/2023 | 09/08/2023 | 10:00 PM | |
Stay Rod | 75 | 08/08/2023 | 09/08/2023 | 10:00 PM | |
Stay Bolted type SH2 Angle Bracket DWG | 75 | 08/08/2023 | 09/08/2023 | 10:00 PM |
SPECIFICATION
1.Stay Bow c/w Thimble 5/8’’ (16mm) 2. Stay Plate Galv 5/8’’ x 6mm (16mm) 3. Stay Washer 5/8’ (16mm) 4. Stay Rod 5/8’ c/w Nut & Washer 5. Stay Bolted type SH2 Angle Bracket DWG DOCUMENTS REQUIRED (together with the quotations) |
||||
1. Copy of Current Tax Clearance Certificate ITF263 | ||||
2.Proof of Registration with PRAZ or a proof of registration in the form of the Government Gazette or
Certified letter from PRAZ accompanied with a certified receipt from PRAZ.( In the relevant category) |
||||
TERMS | ||||
1. State payment terms. | ||||
2.Bid Validity of 30 days is required and must be clearly stated. | ||||
3. State delivery period. | ||||
PLEASE NOTE: | ||||
ZETDC STANDARD PAYMENT TERMS ARE THIRTY (30) DAYS FROM DATE OF INVOICE (NO ADVANCE PAYMENT BEFORE DELIVERY OF GOODS/SERVICES.
ALL QUOTATION IN US$ WILL BE PAID IN ZWL$ AT THE PREVAILING RBZ INTERBANK RATE ON THE DATE OF PAYMENT |
||||
ZETDC STANDARD QUOTATION VALIDITY PERIOD IS 30 DAYS . | ||||
ZETDC DELIVERY IS EX-STOCK | ||||
Failure to abide with above terms will lead to Automatic disqualification of bid. | ||||
Failure to deliver within the stipulated period will result in Automatic cancellation of the order. | ||||
SUBMISSION OF DOCUMENTS | ||||
|
||||
Please follow and like us: