ZIMBABWE ELECTRICITY TRANSMISSION & DISTRIBUTION COMPANY
SOUTHERN REGION
Daily Fault Report Date: 16 April 2018
Client Centre |
Feeder |
Nature of Fault |
Date of Fault |
Number of Affected Customers |
Expected Date of Restoration |
Responsibility |
|
1.0 | ZVISHAVANE | 11kV Rural Feeder | Line Fault |
15/05/2018 |
50 |
16/05/2018 |
Principal Engineer (Zvishavane) |
2.0 | ZVISHAVANE | 11kV Mnene Feeder | Line Fault |
15/05/2018 |
550 |
16/05/2018 |
Principal Engineer (Zvishavane) |
3.0 | ZVISHAVANE | 11kV Buchwa Feeder | Line Fault |
15/05/2018 |
600 |
16/05/2018 |
Principal Engineer (Zvishavane) |
4.0 | GWERU ENVIRONS | 33kV Mvuma Feeder | Single-Phasing |
16/05/2018 |
300 |
16/05/2018 |
District Manager(Gweru)
|
5.0 | KWEKWE | 11KV Kwekwe Feeder S105 | Line Fault |
15/05/2018 |
250 |
16/05/2018 |
District Manager (Kwekwe) |
Comments:
1.0 The Zvishavane Rural Feeder faulted on 15/05/2018 and was partially restored. The fault was still being located and the expected power restoration date is 16/05/2018. 2.0 The Mnene Feeder faulted on 15/05/2018 and the fault was still being located. The expected power restoration date is 16/05/2018. 3.0 The Buchwa Feeder faulted on 15/05/2018 and the fault was still being located. The expected power restoration date is 16/05/2018. 4.0 The Mvuma Line faulted on 16/05/2018 and the fault was located as single phasing. The expected power restoration date is 16/05/2018. 5.0 The Kwekwe Feeder faulted on 15/05/2018 and the fault was still being located. The expected power restoration date is 16/05/2018.
|
Eng. G Kasipo
Engineering Manager – Southern