Daily Fault Report Date: 17 May 2018
Client Centre |
Feeder |
Nature of Fault |
Date of Fault |
Number of Affected Customers |
Expected Date of Restoration |
Responsibility |
|
1.0 | ZVISHAVANE | 11kV Phoniex Feeder | Single Phasing |
16/05/2018 |
150 |
17/05/2018 |
Principal Engineer (Zvishavane) |
2.0 | ZVISHAVANE | 11kV Ngungumbane Feeder | Pole down |
16/05/2018 |
250 |
17/05/2018 |
Principal Engineer (Zvishavane) |
3.0 | ZVISHAVANE | 11kV Buchwa Feeder | Single Phasing |
15/05/2018 |
400 |
17/05/2018 |
Principal Engineer (Zvishavane) |
Comments:
1.0 The Phoniex Feeder Line faulted on 16/05/2018 and the fault was located as single phasing. The expected power restoration date is 17/05/2018. 2.0 The Ngungumbane Line faulted on 16/05/2018 and the fault was located as 1 pole down. The expected power restoration date is 17/05/2018. 3.0 The Buchwa Line faulted on 15/05/2018 and the fault was located as single phasing. The expected power restoration date is 17/05/2018. |
Eng. G Kasipo
Engineering Manager – Southern