ZIMBABWE ELECTRICITY TRANSMISSION & DISTRIBUTION COMPANY
OUTHERN REGION
Daily Fault Report Date: 12 APRIL 2018
No. |
Client Centre |
Feeder |
Nature of Fault |
Date of Fault |
Number of Affected Customers |
Expected Date of Restoration |
Responsibility |
1.0 |
NEMBUDZIYA | 33kV Siakobvu Feeder | Poles Down |
10/04/2018 |
350 |
12/04/2018 |
District Manager(Kwekwe) |
2.0 |
GOKWE | 33kV Mkoka Feeder | Line Fault |
10/04/2018 |
40 |
13/04/2018 |
District Manager(Kwekwe) |
3.0 |
GOKWE | 33kV Sengwa Feeder | Poles Down |
09/04/2018 |
55 |
12/04/2018 |
District Manager(Kwekwe) |
4.0 |
NKAYI | 11kV Kana Feeder | Line Fault |
12/04/2018 |
25 |
12/04/2018 |
District Manager(Kwekwe) |
5.0 |
KWEKWE | 11kV Cricket Feeder | Single Phasing |
10/04/2018 |
50 |
12/04/2018 |
District Manager(Kwekwe) |
6.0 |
NKAYI | 11kV Arda Feeder | Pole Down |
11/04/2018 |
50 |
12/04/2018 |
District Manager (Kwekwe) |
7.0 |
ZVISHAVANE | 11kV Town Feeder | Conductors Down |
12/04/2018 |
2000 |
12/04/2018 |
Principal Engineer (Zvishavane |
8.0 |
ZVISHAVANE | 11kV Buchwa Feeder | Line Fault |
12/04/2018 |
500 |
12/04/2018 |
Principal Engineer (Zvishavane |
9.0 |
ZVISHAVANE | 11kV Rural Feeder | Line Fault |
11/04/2018 |
200 |
12/04/2018 |
Principal Engineer (Zvishavane |
10.0 |
MATAGA | 11kV Masase Feeder | Line Fault |
11/04/2018 |
500 |
12/04/2018 |
Principal Engineer (Zvishavane |
11.0 |
MATAGE | 11kV Mpamashango Feeder | Single Phasing |
11/04/2018 |
200 |
12/04/2018 |
Principal Engineer (Zvishavane |
12.0 |
GWERU URBAN | 11KV Gweru Hospital Feeder | Line Fault |
12/04/2018 |
300 |
12/04/2018 |
District Manager(Gweru) |
13.0 |
SJURUGWI | 11KV Surprise Feeder | Line Fault |
12/04/2018 |
100 |
12/04/2018 |
District Manager (Gweru) |
Comments: 1.0 The Siakobvu Line faulted on 10/04/2018 and the fault was located as poles down. The expected power restoration date is 12/04/2018
2.0 The Mkoka Feeder faulted on 10/04/2018 and the fault was being located. The expected power restoration date is 13/04/2018 3.0 The Sengwa Line faulted on 09/04/2018 and the fault was located as 2 poles down. The expected power restoration date is 12/04/2018 4.0 The Nkayi Feeder faulted on 12/04/2018 and the fault was being located. The expected power restoration date is 12/04/2018 5.0 The Cricket Mine Feeder faulted on 10/04/2018 and the fault was located as single phasing. The expected power restoration date is 12/04/2018 6.0 The Arda Feeder Line faulted on 11/04/2018 and the fault was located as pole down. The expected power restoration date is 12/04/2018 7.0 The Zvishavane Town Feeder line faulted on 12/04/2018 and the fault was located as conductors down. The expected power restoration date is 12/04/2018 8.0 The Buchwa Feeder faulted on 12/04/2018 and the fault was being located. The expected power restoration date is 12/04/2018 9.0 The Zvishavane Rural Feeder faulted on 11/04/2018 and the fault was being located. The expected power restoration date is 12/04/2018 10.0 The Masase Feeder faulted on 11/04/2018 and the fault was being located. The expected power restoration date is 12/04/2018 11.0 The Mpamashango Line faulted on 11/04/2018 and the fault was located as single phasing. The expected power restoration date is 12/04/2018 12.0The Chiwundura Feeder faulted on 12/04/2018 and the fault was being located. The expected power restoration date is 12/07/2018. 13.0The Surprise Feeder faulted on 12/04/2018 and the fault was being located. The expected power restoration date is 12/07/2018.
The increase in Fault is due to the Rains experienced in most parts of the Region
|
Eng. G. Kasipo
Engineering Manager – Southern